Short Lead Time for Composite Floor Slab Supplier - Bi-apartment Horizontal Integrated Box Culvert Mould – Hicorp Group

The underground Integrated Box Culvert Mould is mostly applied to the construction of public tunnels for centralized laying of power, communication, radio and television, water supply, drainage, heat, gas, as well as other urban underground pipelines. It fundamentally solves the problem of “road zipper”of repeatedly excavations on the ground, and gradually eliminates spider-web overhead lines in main streets. Our Integrated Box Culvert Mould has absorbed the advanced technology fr...


Product Description

Product Tags

Related Video

Feedback (2)

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Metro Tunnel Lining Segment Mould, Tunnel Lining Segment Carousel, Precast Concrete Box Culvert Mold, Please feel absolutely free to speak to us for organization. nd we believe we will share the best trading practical experience with all our merchants.
Short Lead Time for Composite Floor Slab Supplier - Bi-apartment Horizontal Integrated Box Culvert Mould – Hicorp Group Detail:

The underground Integrated Box Culvert Mould is mostly applied to the construction of public tunnels for centralized laying of power, communication, radio and television, water supply, drainage, heat, gas, as well as other urban underground pipelines. It fundamentally solves the problem of “road zipper”of repeatedly excavations on the ground, and gradually eliminates spider-web overhead lines in main streets. Our Integrated Box Culvert Mould has absorbed the advanced technology from well-known international mould manufacturers. According to the domestic underground construction conditions, we have successfully built a high-end mould product which can adapt to harsh environment, non-deforming and non-leakage slurry after continuous production, and the finished product is smooth and non-porous . The Mould has been adopted by many domestic prefabricated component factories for its constantly improvement and promotion..

Ready for Delivery

33 1

33 1

33 1

33 1

33 1

33 1

33 1

33 1

33 1

33 1

33 1

33 1


Product detail pictures:

Short Lead Time for Composite Floor Slab Supplier - Bi-apartment Horizontal Integrated Box Culvert Mould – Hicorp Group detail pictures

Short Lead Time for Composite Floor Slab Supplier - Bi-apartment Horizontal Integrated Box Culvert Mould – Hicorp Group detail pictures


Related Product Guide:

The company upholds the philosophy of "Be No.1 in quality, be rooted on credit and trustworthiness for growth", will continue to serve old and new customers from home and overseas whole-heatedly for Short Lead Time for Composite Floor Slab Supplier - Bi-apartment Horizontal Integrated Box Culvert Mould – Hicorp Group , The product will supply to all over the world, such as: Sevilla, Bhutan, Gabon, Since always, we adhering to the "open and fair, share to get, the pursuit of excellence, and creation of value"values, adhere to the"integrity and efficient, trade-oriented, best way , best valve" business philosophy. Together with our all over the world have branches and partners to develop new business areas, maximum common values. We sincerely welcome and together we share in global resources, opening up new career together with the chapter.
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Hilary from Luxemburg - 2017.03.07 13:42
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Nicole from Brasilia - 2018.11.02 11:11
    Write your message here and send it to us